SylantWolf
SylantWolf
2 / 0
5th November
5th November
Changes: Removed E-Wall from flare vent + added extra fans to prevent blow back. 2. Added pump to exit of reactor to control pressure; ~5. 3. Changed shape of ignition chamber + added OXYG to engine.

Comments