L.P.E [0:55] estimated calculated: .0005702848575%
low probability event - [Time: 0:02 || Estimated Event Probability: 0.7%!]
Could very well be the equivalent of a "quantum tunneling type of event" Idk?
Best? - L.P.E [Time: 0:04 || Estimated Event Probability: 0.03%!!!!] - I'm just as baffled as you are XD,this is truly the L.P.E In TPT, I didn't even think this was possible, TBH. te best L.P.E able to be recoreedd! I Think,There are still plenty of other experiments that can be done with this setup. Let me know what you do with it.
New L.P.E [Time: 0:03||Event Probability: 1.1%]
L.P.E = "Least Probable Event"
here's an example: I just got one at , [Time: 0:33 With estimated 0.3% probability slit] So The New % with added time would be an estimated 2.9% within a 0:03 time interval.
if You guys want to make it easyer, calculate the new % over time before posting.
TechNetMG Still Has The Least Probable Event Ever Recored.
I mess up Lol [TechNetMG's Estimated % over time, is 1.8%] putting him in at the end of the yelllow