How much power would this make? The primary and secondary turbines, heated by both core chamber and waste tank circulation make about 900MW if both are at full speed. The fuel tank turbine, heated directly, would only make 100MW at full speed, but the actual output is only 3MW. The waste tank Boiler, heated directly with no circulation has 4 different turbines making 4500MW total at full speed.
the waste Boiler is basically a fuel heat trap. it'll almost never be triggered.
you know what this needs? M O R E T U R B I N E S
The fuel tank has become the long Boi, but how are he doing?
Minor reactor chamber overhaul.
Next up:Reactor chamber overhaul.
MAJOR overhaul to fuel tank! Now it's much more than 3 charges until empty!
MAJOR overhaul to waste storage.
Sub-automatic gate system added.